Manufacturers and Contractors and installers
Do you want to know which problems will your new construction project be facing 3 months from now? Take the ability to look into the future - reduce risk, optimize your project schedule, take control of your resources and budget.
DIAGNOSIS
Budget overrun
Schedule overrun
Demanding coordination of owner, design team and sub-contractors
Project inconsistencies in Architectural, Structural and MEP drawings
Demanding constructability issues and change management
RECOVERY RESULTS
Reduction of construction costs by 3-5%
Reduction of site production time by 10%
Reduction of RFIs (Requests For Information) and RFCs (Requests For Change)
Higher productivity resulting in a leaner construction process
Efficient communication among project team members
SERVICES
Constructability Studies
Location Based Management
Production Drawings Coordination
Implementation catalogues and virtual reality
Advanced metric As-built models
CERTUS 5D®Constructability Studies
Bring a new generation of model based project coordination, enabling Construction managers and Coordinators to identify in advance: (1) hidden problems in building project documentation that might undermine a successful completion of the building project; (2) key factors for Construction managers’ decision making as works progress; (3) full traceability and review of project changes; (4) identification of potential change orders in advance.
CERTUS 5D® Location Based Management
Using location based management methods that integrate 3D models and project schedules (4D) we create Virtual Construction Simulation to illustrate construction process enabling optimization of building project schedules. The 4D solution helps construction team to evaluate project contract terms and to check the ability to execute the project on time and on budget. Location based methods results in reduction of building project costs from 3% to 5% and up to 10% of the site production time.
CERTUS 5D® Production Drawings Coordination
Take the advantage of our unique model-based approach to production drawings coordination whether you are responsible for installation of steel structure, MEP systems, technological equipment and furniture or construction of the entire facility. We have developed a solution for effective coordination of design and construction team. The result of the process is outstanding: As-built drawings are produced before construction works even start!